Radiogram No. 1202                             Form 24 for 05/24/01.

Satellite Navigation System 1,2 Test. Progress Refuel Tank Connection to the SM Propulsion System.

GMT

Crew

Activity / ODF or R/G

07:00-07:10

 

Morning inspection

07:10-07:40

 

Post-sleep

07:40-08:30

 

BREAKFAST

08:30-08:45

 

Daily planning conference

08:45-09:00

CDR

Work prep

08:45-09:15

FE-1, FE-2

09:00-09:15

CDR

ÁÌÏ Ô1 Absorbent Cartridge Regeneration (end) / SM ACS / pages 7-4 and 7-5, item 7.3, steps 2,3

09:15-11:00

CDR

Progress Ì1-6 unloading using IMS / Progress Transfers List

09:15-10:15

FE-1, FE-2 

10:15-11:45

FE-1

Physical Exercise (RED)

10:20-10:45

FE-2

LAB Payload Status Check

10:45-11:45

FE-2

Physical Exercise (TVIS)

11:00-11:30

CDR

“Cryogem-03M” Refrigerator Installation and Activation / Med Ops Vol.1 / pages 7-4 through 7-5, item 7.1.1; page 7-6, item 7.1.3 + r/g 1213

11:30-12:30

CDR

Physical Exercise – Active Rest / r/g 1211

11:45-12:45

FE-1, FE-2

Robotics Equipment Checkout

12:30-13:20

CDR

ÁÒÕ-15-ÐÑÊ&Ò / CPCF-2. Transfer, stowage, and activation / Biotechnology Procedure / pages 2-2 to 2-9, items 2.2 – 2.5 + r/g 1214, 1216

12:45-13:45

FE-1, FE-2

LUNCH

13:20-14:20

CDR

LUNCH

13:45-16:45

FE-1, FE-2

Robotics Equipment Checkout

14:20-14:36

CDR

ODF Replacement per r/g 1190

14:36-14:46

CDR

Data Connector Mating to ÁÈÒÑ2-12 / r/g 1213

14:46-15:25

CDR

ODF Replacement per r/g 1190

15:25-15:35

CDR

ECLSS (ÑÎÆ) Maintenance at MCC Go

15:35-16:05

CDR

[ÏÑÏ] cap external inspection and checkout on Regul-OC set #3 / r/g 1220

16:05-16:20

CDR

ÁÌÏ Ô2 Absorbent Cartridge Regeneration (start) / SM ACS  /page 7-3, item 7.3, step 1

16:20-16:30

CDR

Oxygen Supply and Distribution Unit –1 (ÁÐÏÊ-1) Separator Inspection

16:30-17:30

CDR

[ÏÑÏ] cap external inspection and checkout on Regul-OC set #3 / r/g 1220

16:45-17:00

FE-1

TORSO Data Prep for Downlink, Cable Demate after Data Transfer is complete / TORSO - Phantom TORSO: Nominals: TORSO Setup and Activate Part 2, step 6)

16:45-18:15

FE-2

Physical Exercise (RED)

17:00-17:15

FE-1

TORSO Data Prep for Downlink, Cable Demate after Data Transfer is complete / TORSO - Phantom TORSO: Nominals: TORSO Setup and Activate Part 2, step 4

17:15-18:15

FE-1

Physical Exercise (TVIS)

17:30-18:50

CDR

Physical Exercise – Active Rest / r/g 1211

18:15-18:35

FE-2

Prep delta file for downlink

18:15-18:45

FE-1

Work prep

18:35-18:55

FE-2

Work prep

18:45-19:15

FE-1

Familiarization with Flight Plan

18:50-19:00

CDR

Report Prep

18:55-19:15

FE-2

Familiarization with Flight Plan

19:00-19:15

CDR

Familiarization with Flight Plan

19:15-19:30

 

Daily Planning Conference

19:30-20:00

 

DINNER

20:00-20:30

 

Daily food ration prep

20:30-21:30

 

Pre-sleep

21:30-06:00

 

SLEEP

End of Radiogram