Radiogram No.
1202
Form 24 for 05/24/01.
Satellite Navigation System 1,2 Test. Progress Refuel Tank Connection to the SM
Propulsion System.
|
GMT
|
Crew
|
Activity / ODF or R/G
|
|
07:00-07:10 |
|
Morning inspection |
|
07:10-07:40 |
|
Post-sleep |
|
07:40-08:30 |
|
BREAKFAST |
|
08:30-08:45 |
|
Daily planning conference |
|
08:45-09:00 |
CDR |
Work prep |
|
08:45-09:15 |
FE-1, FE-2 | |
|
09:00-09:15 |
CDR |
ÁÌÏ Ô1 Absorbent Cartridge Regeneration (end) / SM ACS / pages 7-4 and 7-5, item 7.3, steps 2,3 |
|
09:15-11:00 |
CDR |
Progress Ì1-6 unloading using IMS / Progress Transfers List |
|
09:15-10:15 |
FE-1, FE-2 | |
|
10:15-11:45 |
FE-1 |
Physical Exercise (RED) |
|
10:20-10:45 |
FE-2 |
LAB Payload Status Check |
|
10:45-11:45 |
FE-2 |
Physical Exercise (TVIS) |
|
11:00-11:30 |
CDR |
“Cryogem-03M” Refrigerator Installation and Activation / Med Ops Vol.1 / pages 7-4 through 7-5, item 7.1.1; page 7-6, item 7.1.3 + r/g 1213 |
|
11:30-12:30 |
CDR |
Physical Exercise – Active Rest / r/g 1211 |
|
11:45-12:45 |
FE-1, FE-2 |
Robotics Equipment Checkout |
|
12:30-13:20 |
CDR |
ÁÒÕ-15-ÐÑÊ&Ò / CPCF-2. Transfer, stowage, and activation / Biotechnology Procedure / pages 2-2 to 2-9, items 2.2 – 2.5 + r/g 1214, 1216 |
|
12:45-13:45 |
FE-1, FE-2 |
LUNCH |
|
13:20-14:20 |
CDR |
LUNCH |
|
13:45-16:45 |
FE-1, FE-2 |
Robotics Equipment Checkout |
|
14:20-14:36 |
CDR |
ODF Replacement per r/g 1190 |
|
14:36-14:46 |
CDR |
Data Connector Mating to ÁÈÒÑ2-12 / r/g 1213 |
|
14:46-15:25 |
CDR |
ODF Replacement per r/g 1190 |
|
15:25-15:35 |
CDR |
ECLSS (ÑÎÆ) Maintenance at MCC Go |
|
15:35-16:05 |
CDR |
[ÏÑÏ] cap external inspection and checkout on Regul-OC set #3 / r/g 1220 |
|
16:05-16:20 |
CDR |
ÁÌÏ Ô2 Absorbent Cartridge Regeneration (start) / SM ACS /page 7-3, item 7.3, step 1 |
|
16:20-16:30 |
CDR |
Oxygen Supply and Distribution Unit –1 (ÁÐÏÊ-1) Separator Inspection |
|
16:30-17:30 |
CDR |
[ÏÑÏ] cap external inspection and checkout on Regul-OC set #3 / r/g 1220 |
|
16:45-17:00 |
FE-1 |
TORSO Data Prep for Downlink, Cable Demate after Data Transfer is complete / TORSO - Phantom TORSO: Nominals: TORSO Setup and Activate Part 2, step 6) |
|
16:45-18:15 |
FE-2 |
Physical Exercise (RED) |
|
17:00-17:15 |
FE-1 |
TORSO Data Prep for Downlink, Cable Demate after Data Transfer is complete / TORSO - Phantom TORSO: Nominals: TORSO Setup and Activate Part 2, step 4 |
|
17:15-18:15 |
FE-1 |
Physical Exercise (TVIS) |
|
17:30-18:50 |
CDR |
Physical Exercise – Active Rest / r/g 1211 |
|
18:15-18:35 |
FE-2 |
Prep delta file for downlink |
|
18:15-18:45 |
FE-1 |
Work prep |
|
18:35-18:55 |
FE-2 |
Work prep |
|
18:45-19:15 |
FE-1 |
Familiarization with Flight Plan |
|
18:50-19:00 |
CDR |
Report Prep |
|
18:55-19:15 |
FE-2 |
Familiarization with Flight Plan |
|
19:00-19:15 |
CDR |
Familiarization with Flight Plan |
|
19:15-19:30 |
|
Daily Planning Conference |
|
19:30-20:00 |
|
DINNER |
|
20:00-20:30 |
|
Daily food ration prep |
|
20:30-21:30 |
|
Pre-sleep |
|
21:30-06:00 |
|
SLEEP |
End of Radiogram