Radiogram r/g #1187___________ F24 for May 21, 2001.

ÒÎÐÓ training

Time

Crew

ACTIVITY/ re to ODF or R/G

08:00-08:10

.

Morning inspection

08:10-08:40

.

Personal hygiene (post-sleep)

08:40-09:30

.

BREAKFAST

09:30-09:45

.

Daily planning conference

09:45-10:15

.

Work prep

10:15-12:15

CDR,FE-2

ÒÎÐÓ training   r/g +ODF è ÒÎÐÓ p.15,item. 3, p. 25 item .4

10:15-10:45

FE-1

ICLSS maintenance   ïîÓÇ

10:45-11:05

FE-1

Prep delta file for downlink / R/G 1192

12:15-12:40

FE-1

Payload hardware check in the LAB / Daily Status Check Matrix: Daily Status Check Matrix

12:15-12:45

FE-2

ÐÂÐ ÇÓ /MCOR Troubleshooting OCA_0151A

12:15-13:45

CDR

Physical exercise TVIS

12:40-14:10

FE-1

Physical exercise RED

12:45-13:45

FE-2

Activities with the arm hardware/ ÎÑÀ _0162

13:45-13:55

CDR

Separator’s inspection ÁÐÏÊ -1

13:45-14:45

FE-2

Physical exercise TVIS

14:45-15:00

.

TV broadcasting for ESA (with “Ñåé÷àñ ” TV company   ) regarding the ISS crew activities

15:00-16:00

.

LUNCH

FE-1,FE-2

Rack ARIS installation with the vibroisolation system / Structures Mechanisms Group: S M: Nominal: Rack: EXPRESS-2 Active Rack Isolation System (ARIS) Installation/ Steps 1 t

16:00-20:00

CDR

Replacement of the smoke detectors ÈÄÝ -2 (À 1-À 10) / ÝÑ FGB item.12.1.1 item.12-1,   12-3 + r/g 1184

19:00-20:30

FE-2

Physical exercise RED

19:00-19:15

FE-1

ADVASC. Familiarization with the sampling documentation

19:15-20:15

FE-1

Physical exercise TVIS

20:00-21:00

CDR

Physical exercise VELO+IRED - 1

20:15-20:45

FE-1

Report prep

20:30-20:45

FE-2

20:45-21:15

FE-1,FE-2

Program familiarization

21:00-21:15

CDR

21:15-21:30

.

Daily planning conference

21:30-22:00

.

DINNER

22:00-22:30

.

Daily food ration prep

22:30-23:30

.

Personal hygiene (pre-sleep)

23:30-08:00

.

SLEED

Note: Missing references for US activities see in OSTP

End of   r/g