The wiring of the fuel and oxidizer injector solenoid valves was wrapped around each of the 38 primary RCS thrust chambers to remove electrical power from these valves in the event of a primary RCS thruster instability.
Curator: Kim Dismukes | Responsible NASA Official: John Ira Petty | Updated: 04/07/2002Web Accessibility and Policy Notices